Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | HYJB |
Model Number : | 2 ton |
Price : | Negotiable |
Payment Terms : | L/C, D/A, D/P, T/T, T/T, Western Union, MoneyGram |
Supply Ability : | 200 sets /month |
Delivery Time : | 7 days |
MOQ : | 1 |
2 Ton Ultrafiltration Water Treatment Machine for Mineral and Drinking Water Made
Production Description
The 2-ton ultrafiltration water treatment plant is a system designed for small to medium-sized water treatment needs with a design capacity of 2 tons per hour. The equipment utilizes ultrafiltration membrane technology to remove suspended solids, colloids, bacteria, viruses and other impurities from the water by physical screening, providing clear, safe drinking or industrial water.
Equipment Components
Ultrafiltration Membrane Module: the core filtration part,
containing multiple ultrafiltration membrane elements to realize
high efficiency filtration function.
Pre-treatment system: including water inlet pipe, water inlet
valve, filter, etc., which is used for preliminary treatment of raw
water to protect the ultrafiltration membrane module from
contamination.
Backwashing system: regularly backwash the ultrafiltration membrane
module to remove the pollutants adhered to the membrane surface and
ensure the membrane flux and filtration effect.
Control system: including PLC controller, touch screen, etc., to
realize the automatic operation, monitoring and alarm function of
the equipment.
Piping system: including inlet pipe, outlet pipe, backwash pipe,
etc., used to connect the various parts to ensure smooth water
flow.
Installation and maintenace
⒈ on the location of water softening equipment: water softener must
be placed on a solid horizontal ground, the distance from the drain
to the short best, the distance from the boiler and other heat
sources must be more than 3 meters above, absolutely prohibit the
proximity of acidic liquids or gases. If you need to add other
water treatment equipment (filter, deaerator) should be left in
place.
Peck about the location of the regeneration salt tank and resin:
Should try to be placed in the vicinity of the exchange column, in
order to fully utilize the salt solution, should try to shorten the
size of the plastic pipe for salt absorption.
3) About loading quartz sand and resin:
(1) In order to ensure the uniformity of water distribution, try to
put 150~200mm of good quality quartz sand at the bottom of the
exchange column (not decomposed to produce silicon oxides or
salts).
(2) Before loading resin, the length of the center lift tube should
be checked to see if it is suitable.
Firstly, snap the upper watercloth into the central bearing
interface at the bottom of the self-control head (control valve),
then align the lower end of the center tube into the nest groove at
the bottom of the exchange column, and insert the upper end into
the lower end of the upper watercloth orifice, and then screw it
into the upper end of the exchange column screw port in a clockwise
direction with extreme care, and confirm that the whole screw port
of the control valve can be screwed into the upper end of the
exchange column screw port in a smooth manner, in order to confirm
that the length of the center tube meets the requirements, and that
it can make the center lifting tube The center lift tube can be
tightly connected to the valve head and kept concentric.
(3) After the work of the above test fitting head is completed,
then remove the head by rotating counterclockwise to keep the
center tube in the center again, and place the lower end of the
original head in the center.
Centered, the lower end of the original sticky center lift tube
under the end of the lower water cloth aligned with the bottom of
the groove nest, and soft cloth or plastic tape will be the center
lift tube at the top end of the entrance to seal, began to evenly
fill the quartz sand or resin.
(4) When loading resin, pay attention to the balanced loading
around the center lifting tube, in order to ensure that the
pre-calculated quantity is loaded into the column.
In order to ensure that the previously calculated quantity is
loaded into the column, with the process of the device, the
exchange column should be continuously injected into the water, so
that the resin pores in the air out. It is the best way to maintain
this water-sealed state for resin filling, and it is difficult to
guarantee that the dry resin is filled as much as it should be.
(5) When the resin filling is completed, re-screw the control valve
in a clockwise direction into the threaded port at the upper end of
the exchange column.
At the same time, it is required to ensure the leveling. Note: Do
not forget to install the upper water distributor into the base of
the control valve.
Product Display
![]() |